Servicing roughly a dozen McDonald’s franchise locations in both Ohio and Georgia, HPGX has demonstrated it’s ability to handle the unique load demands for this type of setting. Venues of this type have high peak hour demands with very little space available for well fields – space usually reserved for parking. Total well-field deployment for most of these stores took a total of five days, which was crucial for customer traffic flow.

Cleveland, OH, This franchise location in Garfield Heights area utilized 4,200 linear bore feet to meet roughly 40 tons of cooling dominant load. 

The initial section of a 420′ HPGX column is lowered into the bore. 